# Agile in Corporates, Traditional in the Mittelstand: What Each Can Learn

Author: Marin Niehues, Niehues Consulting · Published: 2024-06-10 · Transformation & Change
Source: https://www.niehuesconsulting.de/en/blog/agile-corporates-traditional-mittelstand/

Agile work fits where requirements become clear along the way and changes are cheap, and traditional planning fits where outcome and route are fixed. Corporates and the Mittelstand often choose by habit and size, although the nature of the work should decide. Each side can adopt a great deal from the other: the corporate the closeness to the outcome, the Mittelstand the regularity of learning.

This article shows the criteria by which to choose a way of working for each initiative, what corporates can see in agile programmes in the Mittelstand and which elements of the traditional Mittelstand are missing in corporates. The Mittelstand here means the German-speaking world's owner-led mid-sized companies.

**The way of working follows the nature of the work. A company that chooses by size or sector gets rituals without effect or plans without contact to reality.**

## Why do corporates work agile while the Mittelstand works traditionally?

Corporates often introduce agile methods first in large development efforts with many participants, because coordination costs most there and methods modelled on software development were available early. In the Mittelstand the strength frequently lies in reliable manufacturing, long customer relationships and short decision paths, and these strengths work well with traditional planning. Both reasons are understandable, yet neither says which way of working fits an individual initiative.

The Agile Manifesto of 2001 comes from software development and aims at work in which requirements change along the way. Traditional phased planning is widespread in manufacturing and construction, where late changes are very expensive. Winston Royce, whose 1970 paper is credited as the origin of the waterfall model, wrote in the same text that the simple phased sequence is risky for all but the simplest undertakings. Phased planning and agile methods are thus answers to two kinds of problems.

The consequences of choosing by size are shown in the article on [agile rituals without effect](/en/blog/agile-rituals-cargo-cult/): the rituals run, yet delivery barely changes.

## By which criteria do you choose agile or traditional?

You choose the way of working for each initiative by five criteria: clarity of requirements, cost of a late change, access to customer feedback, number of teams involved and form of acceptance. The vaguer the requirements, the cheaper late changes and the faster the feedback, the better an agile way of working fits. The clearer the outcome, the dearer the changes and the stricter the acceptance, the better a traditional one fits.

**Criteria grid for choosing the way of working**
Criterion | Agile | Traditional | Hybrid
Requirements | Become clear along the way | Fixed in advance | Core fixed, edges clarify
Cost of a later change | Low, as in software | High, as in construction and manufacturing | Varies by component
Customer feedback | Possible every two to four weeks | Only at acceptance | At fixed milestones
Number of teams | One to a few, more with coordination | Several trades according to plan | Teams with joint planning
Acceptance | Ongoing by the product owner | Formal at the end | Formal at each milestone
Example | New feature in an application | Building a production line | Machine with control software

The grid shows that a company needs several ways of working at once. A machine builder develops the control software in an agile way and builds the housing traditionally, and the interface between the two is settled at a fixed date. Anyone who fills in the grid before an initiative starts makes the choice on the basis of the work itself.

## What can the corporate learn from the traditional Mittelstand?

The corporate can learn from the Mittelstand to keep decision paths short and to leave responsibility for outcomes with people rather than committees. In many Mittelstand firms the managing director or a head of department decides within days, and the person responsible for an outcome is known by name. In large corporates decisions travel through several levels and committees, and an agile rollout reinforces this effect when it creates additional roles and coordination meetings.

A second lesson concerns commitments. The Mittelstand promises dates it keeps, because it calculates them from experience and agrees them personally with the customer. Corporates can adopt the discipline of basing commitments on data, as described in the article on [milestone planning in agile programmes](/en/blog/milestone-planning-agile-programmes/). A third lesson is closeness to the customer: where sales knows the customer personally, feedback flows into development without detours.

## What can the Mittelstand learn from agile corporates?

The Mittelstand can learn from agile corporates to deliver work in short cycles, make progress visible and check regularly whether the right thing is being built. Traditional initiatives often show problems only at acceptance. A sprint rhythm with a demonstration every two to four weeks brings the same information much earlier. The 2020 Scrum Guide provides the Sprint Review for this, in which results are inspected with the stakeholders. How this turns into real decisions is described in the article on the [sprint review](/en/blog/sprint-review-decisions/).

The second lesson concerns learning from mistakes. Retrospectives give teams a fixed place to improve their own work and replace conversations that otherwise happen by chance or not at all. The third lesson is the visibility of work: a Kanban board shows where orders are waiting without anyone having to ask. For businesses with make-to-order production this is often the first gain, because waiting times become visible.

## How does cooperation between a corporate and a Mittelstand firm succeed?

Cooperation between an agile corporate and a traditional Mittelstand supplier succeeds when the interface is designed up front as a contract on outcomes and dates and both sides may keep their way of working. Corporates occasionally ask suppliers to fit into their methodology, for example through daily check-ins or shared boards. That creates effort without gain when the suppliers manufacture hardware. Fixed handover points, clear acceptance criteria and a named contact on each side work better.

## How do you combine both worlds in one organisation?

You combine both worlds by keeping a stable hierarchy for day-to-day business and building a network next to it for change and new ventures. John Kotter describes the model in his 2014 book "Accelerate" as a dual operating system: the hierarchy secures efficiency and reliability, while the network of volunteers and teams seeks opportunities and carries out change. Both systems work simultaneously and are linked by people who take part in both.

For the Mittelstand this means: the proven business stays traditionally managed while one or two agile teams develop new offerings or digital initiatives. For the corporate it means changing only those areas in which the nature of the work demands it.
**Checklist: Does the way of working fit the initiative?**
- Are the requirements clear enough that a third party could implement them without questions?
- How expensive is a change halfway through the project?
- Can a customer or user assess something working every two to four weeks?
- How many teams must bring their results together?
- Does the customer demand formal acceptance at the end?
- Is there an owner who may decide priorities alone?
If answers for clear requirements and costly changes predominate, choose traditional. If answers for open requirements and cheap feedback predominate, choose agile. A mixed picture points to hybrid.

## Combining agile work and traditional planning with Niehues Consulting

[Niehues Consulting](/en/) is a consultancy for AI management and organisation design from a delivery perspective, based in Düsseldorf. Founder Marin Niehues builds organisations that deliver and works on projects ranging from VC-funded scale-ups to DAX 40 corporations, deployed in over 20 countries on six continents. In the service areas of delivery management and organisation design he shapes ways of working so that they fit the nature of the work.

The approach follows the Niehues Delivery Model. Two of its review questions matter when choosing a way of working: who decides, who delivers, who uses? And: which roles, decision paths as well as interfaces does operations need? How an organisation restarts after a first attempt is described in the article on [restarting an agile transformation](/en/blog/agile-transformation-restart/). Scope and terms of an engagement are discussed in the free initial consultation, which you can arrange via the [contact page](/en/#kontakt).

**Conclusion**
The way of working follows the nature of the work, whatever the size of the company. Corporates can adopt short decision paths and personal responsibility from the Mittelstand, and the Mittelstand can adopt short cycles, visibility and regular learning from corporates. The criteria grid settles for each initiative where to work agile, traditional or hybrid.

**Sources**
- Beck et al.: Manifesto for Agile Software Development, 2001
- Royce: Managing the Development of Large Software Systems, conference paper (IEEE WESCON), 1970
- Schwaber, Sutherland: The Scrum Guide, guide, 2020
- Kotter: Accelerate, book, 2014

## Frequently asked questions

### What is the difference between agile and traditional project management?

Traditional management plans an initiative in phases up front and executes the plan, while agile delivers in short cycles and adapts the plan to the results. Traditional fits clear requirements and costly changes, and agile fits open requirements and cheap feedback. Many initiatives combine both.

### Is the Mittelstand less agile than corporates?

The Mittelstand is agile in a different way: it often decides faster and has short paths to the customer, but it works less often in fixed cycles with visible results. Corporates often have more experience with methods and longer decision paths. Maturity can only be judged area by area.

### When does Scrum make sense for a mid-sized company?

Scrum makes sense for initiatives with open requirements, such as software, digital offerings or product development with customer feedback. For recurring production and services with a fixed sequence, Kanban or traditional steering fits better. A pilot with one team shows within a few sprints whether the rhythm suits the work.

### Can you mix agile and traditional in one company?

Yes, and most companies already do. What matters are clear interfaces with fixed handover dates between agile and traditional areas. Kotter's dual operating system offers a model that places hierarchy and network side by side.

### Why do agile transformations fail in large organisations?

Agile transformations in large organisations stay ineffective when roles and rituals are introduced without changing decision rights and budgets. Teams then work in sprints but keep waiting for approvals. The article on restarting an agile transformation describes ways to correct this.

### What is hybrid project management?

Hybrid project management combines traditional planning at programme level with agile work in the teams. Dates, budget and milestones are fixed in advance, and delivery within the milestones happens in sprints. It suits products that combine hardware and software.

### How can a mid-sized company learn from corporates without taking on their bureaucracy?

A mid-sized company adopts the practices with the greatest benefit for its own delivery: short cycles, a visible board and retrospectives. Roles for coordinating many teams only become necessary when several teams work on one outcome. Until then a product owner and one team are enough.