# Agile Rituals Without Impact: How to Spot Cargo Cult

Author: Marin Niehues, Niehues Consulting · Published: 2023-12-21 · Transformation & Change
Source: https://www.niehuesconsulting.de/en/blog/agile-rituals-cargo-cult/

Agile rituals have no impact when meetings take place but no decision and no change follows from them. Cargo cult describes exactly this pattern: the outer form of Scrum is fully in place, and the purpose of each meeting has been lost.

This article goes through the events of the 2020 Scrum Guide one by one, names the purpose, the warning signs and a metric for each, and gives you a test grid with which you can establish within an hour whether the rituals in your company achieve anything. It is written for managing directors and department heads who have introduced agile teams and cannot see why delivery is not getting faster.

**A ritual has impact when a decision demonstrably follows from it. The meeting itself is only the place where the decision is made.**

## What does cargo cult mean in agile methods?

Cargo cult means adopting the visible forms of a method and leaving out the mechanics behind it. The term comes from anthropology and became widely known through the physicist Richard Feynman, who used it in a 1974 address at Caltech under the title "Cargo Cult Science" for research without testing. In his image, islanders in the South Pacific built replica runways after the Second World War in the hope that aircraft with cargo would land again. The form was right, and the effect failed to appear.

Applied to Scrum this means: the team holds a daily every morning, plans sprints on a two-week rhythm and meets for a retrospective, and yet nothing changes in delivery. The 2020 Scrum Guide describes the events as opportunities for inspection and adaptation. Without adaptation the ritual loses its point. What typically remains after a first year is described in the article [Scrum in mid-sized companies](/en/blog/scrum-mid-sized-companies-after-first-year/).

## What is each ritual for?

Each Scrum event has a purpose against which its impact can be measured. The 2020 Scrum Guide sets them out as follows:

- The Daily Scrum, limited to 15 minutes, serves to inspect progress towards the Sprint Goal and to adapt the Sprint Backlog as needed.
- Sprint Planning establishes what work is possible in the sprint and which goal the sprint pursues.
- The Sprint Review serves to inspect the outcome with the stakeholders and to determine adaptations to the Product Backlog.
- The Sprint Retrospective serves to plan ways to increase quality and effectiveness.

Each of these purposes demands a result that shows outside the meeting: a changed plan, a reordered backlog, an agreed improvement. If that result is missing over several sprints, the ritual has lost its purpose.

## How do you recognise rituals without impact?

You recognise them by warning signs that can be observed for each event and backed with a metric. The following table is the test grid.

**Test grid: impact of the agile rituals**
Ritual | Purpose in the 2020 Scrum Guide | Warning sign of cargo cult | Metric | With Niehues Consulting
Daily Scrum | Inspect progress to the Sprint Goal, adapt the plan | Status report to the manager, no change to the plan | Share of dailies with a changed plan or a resolved impediment | Impediments logged with owner and date
Sprint Planning | Set Sprint Goal and feasible scope | Sprint without a goal, list of tasks | Share of sprints that reach the goal | Goal phrased as a business outcome
Sprint Review | Inspect the result with stakeholders, adapt the backlog | Demo without stakeholders, no change of order | Number of backlog changes after the review | Stakeholders with decision authority involved
Retrospective | Plan improvements to quality and effectiveness | Same topics every sprint, no measures carried out | Share of agreed measures completed in the next sprint | Measures in the backlog with an owner
Backlog refinement | Break items into smaller, more precise items and make them understandable | Backlog grows without order | Age of the oldest items in the backlog | Product owner with decision authority

Two observations often suffice for a first diagnosis. Ask each team which decision was taken in the last review and which measure from the last retrospective was carried out. If the participants can name neither, cargo cult is present. The role on which this usually depends is described in the article [Product owner in mid-sized companies](/en/blog/product-owner-mid-sized-companies/).

## What do rituals without impact cost?

Rituals without impact cost the working time of everyone involved without producing anything. The calculation is simple: participants times duration times frequency times fully loaded hourly rate. Here is an example with assumed values that you should replace with your own. A team of eight holds ten dailies of 15 minutes in a two-week sprint, which makes 20 person-hours. Planning, review and retrospective add about 6 hours per person together, so 48 person-hours. In total that is 68 person-hours per sprint. At an assumed fully loaded rate of EUR 70 per hour this comes to around EUR 4,760 per sprint, or a little over EUR 120,000 a year with 26 sprints.

The sum makes visible that every meeting is an investment that deserves an effect. A daily that resolves an impediment pays back within minutes, while a daily that serves as a status round never does.

## Why does cargo cult arise?

Cargo cult arises when the introduction starts with the forms and leaves accountability for impact open. Four causes recur.

The first is introduction by training course: teams learn the terms while the decision paths of the organisation stay unchanged. The second is a product owner without authority, whose backlog may not be adjusted after the review. The third is control by reports: managers use the daily as a status round and shape its behaviour that way. The fourth is the absence of metrics that evidence the purpose of the rituals, so that nobody notices when the impact fails to appear.

The same lever works against all four: give one person accountability for the impact of the rituals and tie it to the metrics of the table. Whether that person is appointed internally or support comes from outside is covered in the article [Agile coaches](/en/blog/agile-coaches-help-or-dependency/).

## How do you restore the impact of the rituals?

You restore it in four steps that can be completed within one quarter.

1. Clarify the purpose: each team states in one sentence per ritual which decision is made there and compares it with the 2020 Scrum Guide.
2. Measure: the metrics in the table are collected over four sprints. The effort is a few minutes per sprint.
3. Cut or change: a ritual whose purpose cannot be evidenced is shortened, rebuilt or paused. The Scrum Guide gives time boxes as upper limits, and shorter meetings are permitted.
4. Clarify decision authority: where decisions from review and retrospective may not be implemented, the decision path is adjusted. This is organisational work and falls to management.

Looking at the flow of work is especially effective. Anyone who measures lead time and waiting times can see whether the rituals speed up delivery. How that works is shown in the article on [flow metrics](/en/blog/flow-metrics-throughput-wip-wait-time/).

## Agile rituals with Niehues Consulting

[Niehues Consulting](/en/) is a consultancy for AI management and organisational design from a delivery perspective, based in Düsseldorf. Founder Marin Niehues builds organisations that deliver, in projects from VC-funded scale-ups to DAX 40 groups and in more than 20 countries on six continents. In the service areas of delivery management and organisational design, Niehues Consulting works on the roles, decision paths and interfaces that decide whether agile work has an effect.

The approach follows the Niehues Delivery Model with the phases of understanding, building and rolling out. Two test questions matter for agile rituals: who decides, who delivers, who uses? Which roles, decision paths and interfaces does operations need? Scope and terms of an engagement are discussed in the free initial consultation, which you can arrange in 30 minutes through the [contact form](/en/#kontakt).

**Conclusion**
Agile rituals work when decisions follow from them: an adapted plan in the daily, an ordered backlog after the review, a completed measure after the retrospective. Test each ritual against purpose, warning sign and metric, and clarify decision authority wherever results get lost.

**Sources**
- Schwaber, Sutherland: The Scrum Guide, 2020
- Feynman: Cargo Cult Science, commencement address at the California Institute of Technology, 1974

## Frequently asked questions

### What is cargo cult in agile software development?

Cargo cult is the adoption of visible agile rituals without the purpose behind them. The team runs daily, planning and retrospective, yet no decisions and no improvements follow from the meetings. The term goes back to Richard Feynman's 1974 address.

### How can I tell that our Scrum meetings are not working?

You can tell by missing decisions. Ask about the last adjustment of the plan in the daily, the last backlog change after the review and the last measure carried out from the retrospective. If the answers are missing, the rituals have no impact.

### How long may a daily scrum last?

A daily scrum may last at most 15 minutes under the 2020 Scrum Guide. Its purpose is to inspect progress towards the Sprint Goal and to adapt the plan. A status report to managers is not part of that purpose.

### How long does sprint planning take?

Sprint planning takes at most eight hours for a one-month sprint and usually less for shorter sprints, as the 2020 Scrum Guide states. The result matters most: a Sprint Goal and a plan for the work.

### What is the purpose of a retrospective?

The retrospective serves to plan ways to increase the quality and effectiveness of the team. It works when at least one measure is carried out in the next sprint. If the same topics recur without change, the team's decision authority needs clarifying.

### When should you abolish an agile ritual?

You should shorten or pause a ritual when its purpose cannot be evidenced over several sprints. First check whether the cause lies in how it is run. A clear goal often helps more than abolition.

### How do I measure the impact of agile ceremonies?

Measure it with one metric per ritual, such as the share of sprints that reach their goal or the share of retrospective measures carried out. Lead time and waiting times then show whether delivery gets faster. The table in this article provides the grid.

### Does an agile coach help against cargo cult?

An agile coach helps when the coach leads teams towards impact and metrics and involves management. Without a change to decision paths even good coaching remains ineffective. Accountability for impact stays in the organisation.
