# Drones and Robots in Inspection: Checking Plant Without Downtime

Author: Marin Niehues, Niehues Consulting · Published: 2024-07-29 · AI Adoption & Operations
Source: https://www.niehuesconsulting.de/en/blog/drone-robot-inspection/

Drones and robots inspect plant without downtime when the inspection has so far required scaffolding, rope access or a shutdown and a sensor can capture the damage you are looking for. The economics come mainly from avoided downtime days and less from the price of the inspection itself. Whether deployment pays for your assets is answered by a cost model with five items, and whether it takes hold in the inspection routine is decided by the organisation.

This article is written for operators of industrial plant and energy networks who are responsible for recurring inspections. It compares the technology by field of use, works through a business case with an example and describes how a pilot reaches the regular inspection plan. Legal questions about drone operation and inspection duties are a matter for specialist lawyers and the competent authorities. This article provides an overview and does not constitute legal advice.

**The biggest lever of robotics in inspection usually lies in avoided downtime and avoided access effort. The price per inspection is mostly the smaller item in the calculation.**

## When do drones and robots pay off in plant inspection?

Drones and robots pay off when access to the inspection point costs more than the inspection itself. This applies to chimneys, boilers, tanks, wind turbines, high-voltage pylons, the roofs of large halls and pipe bridges. In these cases scaffolding, rope-access teams, aerial work platforms, the emptying and gas-freeing of vessels or the shutdown of the plant cause the bulk of the cost. A robot that delivers the same finding without anyone having to climb and without production stopping changes that calculation.

The picture differs for plant that stands still on schedule anyway and is easy to reach. There the robot replaces an inspection with little access cost, and the business case works only through more frequent measurement or better data. As a rule of thumb for pre-selection, where access effort makes up more than half of the total cost of an inspection, the calculation pays off, and below that it seldom does. The threshold is this article's own judgement and not a standard figure, and the calculation below lets you check it for each asset.

## Which technology suits which inspection task?

There are four device groups with different strengths, and the inspection task determines the choice. Aerial vehicles carrying a camera, thermal imager or laser scanner capture large, hard-to-reach exterior surfaces quickly and suit facades and roofs as well as rotor blades, overhead lines or chimneys. Their limits are wind, flight times of typically under an hour per battery and tight spaces with obstacles. For the interior of vessels or boilers there are collision-tolerant aerial vehicles that fly in confined spaces without GPS.

Crawler robots with magnetic wheels move along the steel walls of tanks or pipes and carry ultrasonic sensors for wall-thickness measurement. They deliver readings that a camera cannot reach, such as corrosion beneath the surface. Four-legged walking robots, on sale since 2020 from Boston Dynamics among others and by the Swiss company ANYbotics, patrol facilities on regular rounds and read gauges along the way. They detect heat sources or gas leaks and move over stairs and grating. For areas with an explosion hazard every device needs an appropriate approval under the European ATEX rules, which the manufacturer must evidence. Finally there are underwater vehicles for basins and dam walls.

**Technology by field of use**
Criterion | Aerial vehicle, exterior | Aerial vehicle, interior | Crawler robot | Walking robot
Typical task | Roof, facade, rotor blade, line | Boiler, tank, shaft | Wall thickness on steel surfaces | Patrol, gauge reading, gas alert
Measurement | Camera, thermal image, laser scan | Camera, laser scan | Ultrasound, camera | Camera, thermal image, gas sensor
Strength | Fast coverage of surfaces | Access without scaffolding | Readings beneath the surface | Repeatable routes
Limit | Wind, flight time | Confined space, dust | Magnetic surfaces only | Obstacles, battery life
Access effort replaced | Scaffolding, rope access | Emptying, gas-freeing | Scaffolding, set-up time | Patrols in shift operation

## How do you calculate the business case for inspection robots?

The business case consists of five items that you set against each other per asset and inspection cycle: the cost of downtime, the cost of access, the cost of the inspection itself, the cost of evaluation and the follow-on cost of damage that goes unnoticed. The first item is the number of downtime days multiplied by the contribution margin of one operating day. It is often the largest and is not carried in inspection budgets, because it arises in production. For exactly that reason inspection and production should draw up the calculation together with controlling.

The following example illustrates the logic of the calculation. The values are assumed and are not market data. A plant with a contribution margin of 40,000 euros per operating day is inspected every two years in a three-day shutdown. The shutdown costs 120,000 euros. Scaffolding and cleaning come to 40,000 euros and the inspectors to 10,000 euros, which makes 170,000 euros per cycle. With a robot deployed during live operation, the shutdown, the scaffolding and the cleaning fall away. What remains is a service provider or equipment cost of 30,000 euros, spot checks by specialist staff of 10,000 euros and data evaluation of 8,000 euros, a total of 48,000 euros. The saving of 122,000 euros per cycle can be set against the purchase cost or the service fee.

**The five items at a glance**
- Downtime: operating days without production multiplied by contribution margin per day
- Access: scaffolding, rope access, aerial platform, cleaning, gas-freeing
- Inspection: personnel, equipment, travel
- Evaluation: time for image review, recording of readings, reports
- Follow-on cost: damage missed by the previous inspection, and shorter intervals made possible by lower effort

The fifth item is often neglected. When robot deployment makes inspection cheaper, it can be done more often, and damage is found earlier, before it forces a repair during a shutdown. This effect is hard to quantify in advance. A cautious calculation sets it at zero and treats it as a reserve.

## What role does the inspector keep?

Robots extend the reach of the qualified inspector, and the judgement stays with that person. In non-destructive testing the standard DIN EN ISO 9712 governs the qualification and certification of personnel, and the assessment of a finding remains a task for these specialists. The robot delivers images and readings with position data. The inspector evaluates them and decides on the release. Work therefore shifts from climbing and measuring to evaluating and deciding, and that is a change of role with consequences for training and the inspection plan.

The greatest friction arises at the interface between departments: maintenance runs the pilot, the results go to plant management, and nobody has been given the task of evaluating them. Data volumes from flights and patrols grow quickly, and without a defined evaluation and a handover to maintenance planning, the gain stays in a folder.

## How do you introduce inspection robotics into the inspection routine?

Introduction works in four steps, each ending in a decision. In the first step you select two or three assets with the highest access effort and record the baseline: the cost and duration of the last inspection and the downtime days. In the second step a pilot runs in parallel with the existing inspection, so that both methods assess the same condition. The agreement of the findings shows whether the robot detects the damage being sought. In the third step the inspection plan is adjusted, with roles for operating the device and for evaluation. The fourth step is regular operation with one metric for management, such as downtime days saved per quarter.

**Checklist for the pilot**
Criterion | Met when | Consequence of a no
Access effort | More than half of inspection cost | Move the pilot to another asset
Damage pattern | Detectable by camera, thermal imager or ultrasound | Change device or method
Comparison inspection | Parallel run with the existing method | No regular operation
Responsibility | One post owns operation and evaluation | Pilot fizzles out without effect
Maintenance planning | Findings feed into maintenance planning | Data without effect

How such initiatives fit the question of investment and payback is shown in the article on [planning robot cells](/en/blog/planning-robot-cells-investment-payback-space/). The article on [human-robot collaboration](/en/blog/human-robot-collaboration/) is the natural complement for the effect on staff, and the question of whether renting or buying eases the start is treated in the article on [robotics as a service](/en/blog/robotics-as-a-service-rent-or-buy/).

## Inspection robotics with Niehues Consulting

[Niehues Consulting](/en/) is a consultancy for AI management and organisational design from a delivery perspective, based in Düsseldorf. Founder Marin Niehues brings new technology into operations, on projects from VC-funded scale-ups to DAX 40 groups and in over 20 countries on six continents. Niehues Consulting does not supply robots and does not integrate devices. The work lies before and after: in the business case, in the requirements placed on manufacturers and service providers, in the introduction and in the roles and decision paths of the inspection routine.

The approach follows the Niehues Delivery Model. Three of its test questions matter for inspection robotics: What is the baseline, and how do we measure success? Is the business case confirmed with real values? Who is responsible for operations from day one? The entry point is a free initial consultation of 30 minutes, which you can arrange via [contact](/en/#kontakt). Scope and terms of an engagement are discussed there.

**Conclusion**
Drones and robots pay off in inspection when access and downtime cost more than the inspection. The business case consists of five items, among which downtime usually dominates. The inspector remains the decision-maker on a finding, and the robot supplies the data. A pilot with a comparison inspection, one responsible post and a route into maintenance planning leads to regular operation.

**Sources**
- DIN EN ISO 9712: Non-destructive testing, qualification and certification of NDT personnel
- Directive 2014/34/EU of the European Parliament and of the Council: Equipment and protective systems intended for use in potentially explosive atmospheres (ATEX)

## Frequently asked questions

### How much does a drone inspection cost?

A drone inspection is usually charged per day of deployment or per asset, and the range varies with the asset, the measuring method and the evaluation. Commercially, the comparison with the access cost of the previous inspection decides. Scope and terms of an engagement with Niehues Consulting are discussed in the free initial consultation.

### Can a drone replace a human inspector?

A drone replaces the access, and the assessment stays with a person. It captures images and readings that a qualified inspector evaluates. Where a standard or regulation requires an inspection by certified personnel, that obligation remains.

### When does an inspection robot pay off?

An inspection robot pays off when access effort exceeds half of the inspection cost or the inspection forces a shutdown. For easily reached plant with scheduled downtime the benefit is smaller.

### Which assets suit drones and robots?

Assets with hard-to-reach surfaces suit them: chimneys, tanks, boilers, wind turbines, overhead lines or large roofs and pipe bridges. What matters is that the damage pattern can be recognised by camera, thermal imager, laser scan or ultrasound.

### What is the difference between a drone, a crawler robot and a walking robot?

The drone captures surfaces from the air, the crawler robot travels along steel walls and measures, for instance, wall thickness, and the walking robot follows the same route through a facility at regular intervals. The choice follows the inspection task and the space in which the device works.

### How long does it take to introduce inspection robotics?

Introduction runs through baseline, a pilot with parallel inspection, adjustment of the inspection plan and regular operation. The duration follows the inspection cycle of the asset, because the comparison inspection has to cover one complete cycle.

### Who evaluates the data from drones and robots?

The qualified inspector evaluates it, supported by software for image and measurement analysis. Before the start it should be settled who evaluates, where the data is stored and how findings reach maintenance planning.

### What role does AI play in robot inspection?

AI helps to sift large volumes of images, for example by recognising cracks, rust or thermal anomalies, and sorts findings by urgency. The release of a finding stays with the inspector.