# Humanoid Robots: What Lies Behind the Hype Around Optimus, Figure and Others

Author: Marin Niehues, Niehues Consulting · Published: 2024-01-04 · AI Adoption & Operations
Source: https://www.niehuesconsulting.de/en/blog/humanoid-robots-hype-optimus/

Humanoid robots in 2024 are development projects with impressive demonstrations but no proven economics in regular operation. Observing them is worthwhile for a company. Investing is worthwhile only when a manufacturer shows sustained output and safety approval in a comparable operation, along with the cost per hour of use. Until then, proven systems such as industrial robots, cobots and autonomous mobile robots decide automation projects.

Videos of Tesla Optimus and Figure as well as Agility Robotics draw millions of views, and board meetings now ask whether the company is missing out. The pressure is understandable. This article puts the systems in context: what they can do and what manufacturers announce, a worked calculation of what a humanoid robot would have to achieve, and a checklist for the decision.

**A humanoid robot pays back only when it fills a job at a fraction of the cost of a person. The videos show individual abilities, while the economics are settled by sustained output, downtime and running costs.**

## What can humanoid robots do today?

Humanoid robots can walk and pick up light loads, but the demonstrations take place under controlled conditions and no independent measurements from continuous operation exist. Tesla presented the first Optimus prototype at its AI Day in September 2022 and named a target price below 20,000 US dollars at high volume. In December 2023 the company showed a second generation in a video, which according to the manufacturer walks about 30 per cent faster and has hands with tactile sensors in the fingers. Figure, founded in 2022, presented its own prototype in 2023, and Agility Robotics is developing Digit, a two-legged robot for warehouses and logistics that moves totes. All the figures cited come from the manufacturers themselves.

What is actually in use in factories and warehouses is something else. The International Federation of Robotics reported in September 2023 a record 553,052 newly installed industrial robots worldwide in 2022, five per cent more than the year before. Around 73 per cent of them went to Asia. These machines have no legs and no hands, and they have worked reliably for decades. The article on [robotics in mid-sized companies](/en/blog/robotics-mid-sized-companies-economic-case/) shows where robots already pay off.

## Why the human form, and what speaks against it?

The human form has one real advantage: a humanoid robot can work in environments built for people, with stairs and doors as well as shelves reached by hands. That saves rebuilding a hall. Against this stand drawbacks that every operator knows. Two legs need active balance and therefore energy that a wheel or a fixed base does not consume. Hands with many joints are complex and prone to failure. Battery runtime is limited, and a falling robot of human size is a safety hazard.

Standards set limits as well. The safety rules for industrial robots (ISO 10218) and for collaboration between humans and robots (ISO/TS 15066) were written for robot arms at fixed stations. A dynamically balancing biped working beside employees raises questions these rules do not answer, and no robot runs in regular operation without approval from the safety specialists. How robots can work safely beside people is described in the article on [cobots](/en/blog/cobots-collaborative-robots/).

## When would a humanoid robot pay back?

A humanoid robot pays back when the annual saving from replaced working hours exceeds running costs and the investment is recovered within a period that fits its service life. The calculation below is an example with assumed values and not a market forecast. It shows which variables determine the result.

**Payback calculation with assumed values**
1. Labour cost per hour: 40 euros. According to the Federal Statistical Office, labour costs per hour worked in the German private sector were around 39.50 euros in 2022.
2. Hours in use: 3,000 a year in two-shift operation.
3. Performance factor relative to a person: 100 per cent, 50 per cent or 25 per cent. A factor of 50 per cent means the robot takes twice as long for the same work.
4. Annual saving: hours in use times performance factor times labour cost. At 100 per cent this is 120,000 euros, at 50 per cent 60,000 euros, at 25 per cent 30,000 euros.
5. Running costs for maintenance, energy, software and supervision: assumed at 30,000 euros a year.
6. Total investment including integration and safety approval: assumed at 250,000 euros.
7. Payback: investment divided by annual saving less running costs. At 100 per cent performance this is 2.8 years, at 50 per cent 8.3 years, at 25 per cent never.

The example shows where the decision falls. The price of the robot influences the result less than the performance factor and the running costs. A device that works at half the speed of a person and needs constant supervision does not pay back over its service life, even if it is cheap. For manufacturers this is the real hurdle, and it explains why the videos rarely show timings for complete work steps.

## Comparing robot types for your operation

Which type fits a task depends on the environment, the maturity and the approval of the safety specialists. The table sorts the four types by these criteria.

**Robot types at a glance**
Criterion | Industrial robot | Cobot | Autonomous mobile robot | Humanoid robot
Typical use | Welding, assembly, palletising in cells | Manual workstation with a person in the room | Moving totes and pallets | Open, pilot trials in warehouse and production
Maturity in operation | Decades, mature | Established, growing adoption | Established in logistics | Prototypes and first pilot projects
Safety standards | ISO 10218 | ISO 10218 and ISO/TS 15066 | Standards for automated guided vehicles | No dedicated industrial standard for dynamically balancing bipeds
Proven economics | Yes, payback can be calculated | Yes, for suitable tasks | Yes, in warehouses with long travel distances | Open, no independent data
With Niehues Consulting | Business case and introduction | Introduction and organisation of workstations | Process mapping and sequencing | Observation with fixed trigger criteria

Anyone looking to automate a warehouse will find a calculation for the type with proven economics in the article on [automated guided vehicles](/en/blog/agv-amr-warehouse-business-case/).

## How should executives approach the topic?

Executives should observe the topic and set fixed trigger criteria for doing so. As in every technology cycle, announcements are declarations of intent, and only what runs in a third party's operation is proven. The article on the [AI hype cycle](/en/blog/ai-hype-cycle-progress-versus-announcement/) describes the features that separate progress from announcement.

**Checklist: when does observation become a pilot?**
- A manufacturer demonstrates several months of continuous operation in a comparable task, confirmed by the operator.
- Sustained output for a complete work step is documented with measured values, including downtime and supervision.
- There is a safety approval that your occupational safety specialist accepts.
- Service and spare parts are available in your region.
- The calculation above, with a conservative performance factor, gives a payback within the service life.

If all five points are met, a limited pilot at one workstation with a clear metric is worthwhile. Until then, observation costs only a few hours a quarter, in which one responsible person evaluates manufacturer statements and operator reports.

## Humanoid robots and Niehues Consulting

[Niehues Consulting](/en/) is a consultancy for AI management and organisation design, seen from the delivery perspective, based in Düsseldorf. Founder Marin Niehues brings new technology into operation, in projects ranging from VC-funded scale-ups to DAX 40 corporations and in more than 20 countries on six continents. Niehues Consulting does not supply robots or integrate cells. It supports business case and introduction as well as delivery management and organisation, which means the question of whether and when a purchase pays back and how the operation absorbs it.

The approach follows the Niehues Delivery Model. For robotics initiatives, three of its test questions matter most: which business result should change measurably? Does the prototype prove the benefit in the real process with real data? Who is responsible for operations from day one? The starting point is a free initial consultation of 30 minutes, which you can arrange via the [contact page](/en/#kontakt). Scope and terms of an engagement are discussed there.

**Conclusion**
Humanoid robots are a technology executives should observe. Economics are proven for industrial robots and cobots as well as for autonomous mobile robots. For humanoids the performance factor is the decisive variable, and it has so far not been measured independently. Fixed trigger criteria turn pressure into a plan.

**Sources**
- International Federation of Robotics: World Robotics 2023, press release of 26 September 2023
- Federal Statistical Office (Destatis): labour costs per hour worked 2022, press release, 2023
- Tesla: AI Day presentation of 30 September 2022 and Optimus Gen 2 video of December 2023 (manufacturer statements)
- ISO 10218 (industrial robots, safety) and ISO/TS 15066 (collaborative robots)

## Frequently asked questions

### What can the Tesla Optimus robot do?

According to the manufacturer, Optimus walks and can pick up and lift light objects. In December 2023 Tesla showed a second generation in a video, with hands and tactile sensors. No independent measurements from continuous operation exist, and a sale to companies has not been announced.

### When will humanoid robots arrive in factories?

Pilot trials are under way at individual manufacturers, but regular operation is not proven. Executives should work with trigger criteria: continuous operation at a third party, measured values for complete work steps and a safety approval. Only when these exist is a pilot worthwhile.

### How much does a humanoid robot cost?

There are no reliable market prices, because no manufacturer sells the robot regularly. Tesla named a target below 20,000 US dollars at high volume in 2022. For the business case the total cost of integration, safety approval and operation counts in any event.

### Are humanoid robots better than cobots or industrial robots?

For today's tasks they are not. Industrial robots and cobots are faster and more precise as well as cheaper per work step. Humanoids have an advantage only where an environment built for people cannot be rebuilt, and that is a small share of cases.

### How do you calculate the return on a robot?

Annual saving from replaced working hours times the performance factor, less running costs, gives the annual benefit. The investment divided by that benefit is the payback period. The performance factor relative to a person influences the result most.

### What safety standards apply to robots?

ISO 10218 applies to industrial robots and ISO/TS 15066 to collaboration with people. Both were written for arms at fixed stations. There is no dedicated industrial standard for balancing bipeds, so every application needs an individual approval from the safety specialists.

### Is a company missing out if it does not invest in humanoids now?

No, as long as it watches the trigger criteria. Series deliveries to operators are not proven, so an early start gives no advantage in operation. A company that introduces proven automation in the meantime gains experience with processes and roles as well as maintenance, which every future robot will need.
