# Managing Dependencies Between Teams: From Big Room Planning to Interface Agreements

Author: Marin Niehues, Niehues Consulting · Published: 2023-11-30 · Delivery & Steering
Source: https://www.niehuesconsulting.de/en/blog/managing-dependencies-between-teams/

You manage dependencies between teams in four stages: first reduce them by cutting teams along the flow of work, then make them visible, then plan jointly and finally agree interfaces in binding form. Which stage matters depends on the number of teams involved and on how often work crosses a team boundary. Anyone who measures the waiting time at handovers sees where dependencies really cost delivery time.

Dependencies are the most common reason why initiatives take longer than planned, even when every single team works briskly. One team waits for a delivery, another for a decision, a third for access to a system. Each of these waits is small on its own, but together they determine the lead time. This article sorts the types of dependency, compares the common approaches and gives criteria for choosing the approach that suits the size of the organisation.

**The most effective dependency is one that never arises. Planning rounds and agreements are worth their cost only once the team structure has been exhausted.**

## What types of dependencies exist between teams?

Four types of dependency exist between teams: sequence, knowledge, resources and interfaces. A sequence dependency exists when a team can start only after another has delivered a result. A knowledge dependency arises when only one person or team understands a system or a business rule and everyone else has to ask. Resource dependencies concern scarce specialists, test environments or approvals that several teams need at once. Interface dependencies, finally, exist where the output of one team must fit the input of another technically or in substance.

The distinction has practical value because each type calls for a different remedy. You resolve sequences through planning, knowledge through distribution and documentation, resources through allocation or capacity building, and interfaces through agreements. Anyone who tries to handle all dependencies with one planning round solves at most the first type.

The origin of many dependencies is the organisation structure itself. Melvin Conway described in 1968 that organisations design systems that mirror their own communication structure. If work is cut by function, for example analysis, development, testing and operations, every initiative has to pass through all functions, and a handover arises at each boundary. How teams can be cut differently is described in the article on [Team Topologies](/en/blog/team-topologies-organising-teams-for-flow/).

## How much do dependencies actually cost?

Dependencies cost delivery time, and a simple calculation can put a figure on it. For a typical initiative you count the handovers between teams, estimate the average wait per handover and compare the total with the pure working time. The following example is illustrative. An initiative needs ten working days of pure effort and passes through six handovers with four working days of waiting each. Lead time is then 34 working days, and the share of working time in lead time is about 29 per cent. For more than two thirds of the time the work lies idle.

This metric, called flow efficiency, shows where improvement pays off. If the organisation halves the number of handovers from six to three, lead time falls to 22 working days without anyone working faster. Which metrics suit the measurement is shown in the article on [flow metrics](/en/blog/flow-metrics-throughput-wip-wait-time/).

**Calculation for your organisation**
- Pick a typical initiative from the last twelve months
- Count the handovers between teams and take the wait per handover from calendar data
- Estimate the pure working time with the teams involved
- Calculate the share of working time in total time
- Tackle the three handovers with the longest wait first

## Which approaches suit which size?

The suitable approach depends on the number of teams working together on an initiative and on how frequent the handovers are. With up to three teams, direct agreement is enough, supported by a shared board. With four to seven teams, a regular exchange between team representatives, known as a Scrum of Scrums, plus a shared overview of dependencies is advisable. From about eight teams delivering a shared outcome, a joint planning event for everyone involved, big room planning, pays off.

**Approaches to managing dependencies**
Criterion | Direct agreement | Scrum of Scrums | Big room planning | Interface agreement
Number of teams | Up to three | Four to seven | From about eight | Any number, for permanent interfaces
Rhythm | Continuous | Once or twice a week | Every eight to twelve weeks, one to two days | Agreed once, adjusted on change
Mainly solves | Sequence on a small scale | Current blockers | Sequence and resources on a large scale | Technical and business interfaces
Effort | Low | Medium | High | Medium to high at set-up
Risk | Knowledge stays with individuals | Turns into a reporting round | Plan ages between events | Rigidity when requirements change
With Niehues Consulting | Clarifying roles and decision paths | Facilitation and escalation path | Planning, preparation and follow-up | Owners and change process

Big room planning is the common name for the planning of a program increment in the scaling framework SAFe, usually held over one to two days every eight to twelve weeks. All participating teams plan together in one room, show their dependencies on a board and resolve them in direct conversation. The strength of the approach lies in simultaneity: questions that would otherwise wander between teams for weeks are answered in one afternoon. The weakness is the effort. Tying up around a hundred people for two days costs capacity, and without preparation through clear priorities the event turns into a hunt for dates.

## What does a good interface agreement look like?

A good interface agreement records in writing what a team delivers, in which format, by when and who decides on changes. It is short, readable on one page and describes both the delivery and the expectation placed on the recipient. For software, the agreement can be kept as a description of the technical interface, and for business handovers as a checklist with entry criteria. Where a team serves many others, such as a platform, a service description naming response times and contacts supplements the agreement.

Team Topologies distinguishes three forms of collaboration here: close joint work over a limited period, use of a team as a service with a clear interface, and facilitating support in which one team passes knowledge to another. The choice of form determines how much coordination is needed permanently. A service with a stable interface causes hardly any coordination effort after set-up, whereas close collaboration ties up both teams for as long as it lasts.

A frequent mistake is an agreement without a change process. Requirements change, and an interface that can be adapted only through escalation produces exactly the waits it was meant to avoid. Define who decides on a change, how early it is announced and how long the old version remains valid.

## Reduce dependencies before managing them

The lasting solution is to reduce dependencies before managing them. Three levers serve this. The first is a team structure along value streams, so that one team can deliver an outcome from beginning to end. The second is building missing skills into the team, such as testing expertise, so that not every delivery waits for a central test team. The third is reducing shared resources through self-service, for example automatically provisioned test environments.

For initiatives that are meant to deliver in a bounded, fixed period, the working model can also limit dependencies. The article on [Shape Up](/en/blog/shape-up-framework-teams-without-sprints/) presents a model that assigns an initiative to a team as a whole, and the article on [release planning](/en/blog/release-planning-reliable-commitments/) explains how dates are kept when several teams contribute.

## Managing dependencies with Niehues Consulting

[Niehues Consulting](/en/) is a consultancy for AI management and organisation design from a delivery perspective, based in Düsseldorf. Founder Marin Niehues builds organisations that deliver, on projects ranging from VC-funded scale-ups to DAX 40 groups and in more than 20 countries on six continents. In the service line delivery management and organisation design he works as delivery manager, project manager or product owner at exactly the places where work gets stuck between teams.

The approach follows the Niehues Delivery Model with three phases. Two test questions count for dependencies: who decides, who delivers, who uses? Which roles, decision paths and interfaces does operation need? Where these questions are open, the waits arise that the calculation above makes visible. The entry point is a free initial consultation of 30 minutes, which you can arrange via the [contact form](/en/#kontakt).

**Conclusion**
Dependencies between teams can be sorted by type and size and handled with suitable approaches: direct agreement for few teams, regular exchange for a medium number and joint planning for large initiatives. Interface agreements with a change process keep permanent handovers stable. The greatest lever is the team structure, which lowers the number of handovers from the outset.

**Sources**
- Conway, Melvin E.: How Do Committees Invent?, Datamation, 1968
- Skelton, Matthew; Pais, Manuel: Team Topologies, IT Revolution Press, 2019

## Frequently asked questions

### What are dependencies between teams?

Dependencies between teams are cases in which one team needs a result, knowledge, a resource or a decision from another team in order to continue. They lengthen lead time through waiting at handovers. A distinction is made between dependencies of sequence, knowledge, resources and interfaces.

### How do you identify dependencies in a project?

You identify dependencies by tracing an initiative from start to finish and marking every point at which another team must deliver or approve something. A shared board with a column for waiting work makes them visible. The teams themselves know most of these points if you ask them.

### What is big room planning?

Big room planning is a joint planning session of all teams working on an initiative, held in one room over one to two days. The term describes the planning of a program increment in the SAFe framework, where it takes place every eight to twelve weeks. The aim is to resolve dependencies in direct conversation and to arrive at a shared plan.

### How many teams are needed before big room planning pays off?

Big room planning pays off from about eight teams that deliver a shared outcome and depend on one another frequently. With fewer teams, a regular exchange between team representatives is enough. The number of handovers per initiative matters as much as the number of teams.

### What is a Scrum of Scrums?

A Scrum of Scrums is a regular meeting of representatives from several teams that resolves blockers and dependencies. It usually takes place once or twice a week and lasts half an hour. It suits four to seven teams and stays effective as long as it produces decisions and does not turn into a reporting round.

### How many dependencies are normal?

There is no fixed number, but there is a yardstick: if an initiative waits for other teams for more than half of its lead time, there are too many dependencies. The calculation in this article gives the counterpart as flow efficiency, the share of working time. If it falls below 50 per cent, a look at team structure and handovers is worthwhile.

### Who is responsible for managing dependencies?

The role that is accountable for delivering the whole initiative is responsible, in many organisations a delivery manager or programme lead. The individual teams report their dependencies, and the role makes sure decisions are taken. Without a named owner, dependencies stay unresolved.

### How do you agree interfaces between teams?

You agree interfaces in writing in a short document covering the service, format, deadline, contact and change process. Both teams sign it off by approving it and review it at fixed intervals. For technical interfaces, a description of the data structure belongs with it.
