# The unFIX Model: Organisational Building Blocks Instead of Rigid Structures

Author: Marin Niehues, Niehues Consulting · Published: 2024-01-29 · Organisation Design
Source: https://www.niehuesconsulting.de/en/blog/unfix-model-organisation-building-blocks/

The unFIX model by Jurgen Appelo is a collection of building blocks for organisational design: crews, forums, bases as well as clusters can be combined without adopting a fixed overall structure. It suits companies that want to change their existing structure step by step, and suits less those that expect a complete rulebook of roles and routines. Four test questions show whether and how the model can be tried out in your department.

This article describes the building blocks as presented by the author, places the model between Team Topologies, the Spotify model and classic line organisations, and gives managing directors and heads of department a procedure for checking whether unFIX is an option for them. Anyone weighing a new framework should first work through the questions in the article on [method FOMO](/en/blog/method-fomo-companies-chasing-every-new-framework/).

**unFIX supplies building blocks for organisational design, and the company draws up the blueprint itself. The benefit arises where a company has a concrete structural problem and uses individual blocks deliberately.**

## What is the unFIX model?

The unFIX model is a pattern collection for organisational design, published on unfix.com by Jurgen Appelo, the author of "Management 3.0". Appelo describes organisations as an assembly of reusable building blocks from which a company chooses what suits its situation. Besides the building blocks for teams and units, the collection contains patterns such as Delegation Levels for decision rights and the Business Lifecycle for the maturity of a business area. Appelo stresses that unFIX is a pool of patterns and a framework it is not.

The model therefore addresses companies that want neither to design an organisational form from scratch nor to adopt a framework wholesale. It sees itself as a toolkit. That distinguishes it from frameworks that prescribe roles, events and planning rhythms, and it demands more decisions of its own from leadership.

## Which building blocks does unFIX have?

The central building blocks are crews, forums, bases and clusters. A crew is a team of usually three to seven people who work together on a task. A forum is a group of people from different crews who share a professional interest and exchange ideas, comparable to the chapters and guilds of the Spotify model. A base is the unit in which several crews work together, from a handful of people to a few hundred. A cluster connects several bases and is, at a higher level, what a crew is at the level of individuals.

The blocks are built self-similarly: a crew is a team of people, a cluster a team of bases. This allows the same patterns to be used at different sizes. Appelo has also published comparisons with well-known models, including one with the Spotify model and one with Team Topologies, showing how their building blocks map onto unFIX.

**unFIX compared with related approaches**
Criterion | unFIX | Team Topologies | Spotify model | With Niehues Consulting
Character | Pattern collection for organisational design | Team types and interaction modes | Snapshot of one organisation in 2012 | Selection by the company's problem and context
Building blocks | Crews, forums, bases, clusters | Four types: stream-aligned, enabling, complicated-subsystem, platform | Squads, tribes, chapters, guilds | Roles and decision paths that fit the business outcome
Demand on leadership | Chooses patterns itself | Cuts teams along the flow of work | Copies a picture or uses it as inspiration | Reasoned choice with baseline and metric
Strength | Flexible, usable at any size | Clear link to flow and communication | Easily understood picture of autonomy | Rollout with owners and checkpoints
Limit | Little guidance on rollout and operation | Requires teams with end-to-end responsibility | No rulebook | Presumes willingness to test

## What is unFIX suited for, and what is it not?

unFIX suits companies that want to solve individual structural problems without converting the whole organisation. Typical occasions are too many coordination meetings between teams, unclear responsibility for cross-cutting topics, or the wish to cultivate expertise across team boundaries. For the last, the forum offers a building block; for bundling several teams into one area of responsibility, the base does. The article on [dependencies between teams](/en/blog/managing-dependencies-between-teams/) describes which forms of coordination are available for this.

unFIX suits companies less when they look for instructions with fixed roles, events and rollout steps. The model prescribes no rollout method, and those who need one must design or buy it. Nor does it replace clear decision rights: a forum or a base can only work once it is settled who decides what there. And it helps little when the problem lies in utilisation or in the flow of work, since structural patterns do not change queues.

The primary source is the model's website including the author's blog posts. Studies on the model's effect are hard to find in the academic literature, and decision-makers should bear that in mind. The model is young, and evidence from rollouts comes mostly from practitioners and from the author himself.

## How do you test unFIX in four steps?

A company tests unFIX in four steps without changing the overall structure.

1. Name the structural problem: management formulates a concrete problem with a metric, such as the number of coordination meetings between two departments or the lead time of a delivery that passes through several teams.
2. Choose a building block: one block fits the problem. A forum suits shared expertise, a base suits joint responsibility of several crews, a cluster suits coordination of several bases.
3. Settle decision rights: the company writes down who decides what within the block, which budget applies and how conflicts are resolved. Without this step the block remains a name on a slide.
4. Review after 90 days: the metric from step 1 shows whether the block works. If it does, the next block comes into question; if it does not, it is adjusted or ended.

## Four test questions before deciding

Four questions show whether a company should try unFIX.

1. Which structural problem do we have, and how do we measure it today? Without a baseline the effect cannot be tested.
2. Are there managers who will hand decision rights to crews, forums or bases? Without that willingness the change stays cosmetic.
3. Who designs and accompanies the rollout? The model supplies patterns, not a rollout plan.
4. What does the new block replace, and what happens to the existing structure? A block added on top of existing committees increases coordination.

The questions tie the model to the business outcome. If the answer to one is hard to give, preparation is not yet complete. How teams can be cut along the flow of work is shown in the article on [Team Topologies](/en/blog/team-topologies-organising-teams-for-flow/).

## Choosing organisational building blocks with Niehues Consulting

[Niehues Consulting](/en/) is a consultancy for AI management and organisational design from the delivery perspective, based in Düsseldorf. Founder Marin Niehues builds organisations that deliver, in projects from VC-funded scale-ups to DAX 40 corporations and in more than 20 countries on six continents. In organisational design he defines roles and clarifies decision paths so that deliveries flow through the organisation across team interfaces.

The approach follows the Niehues Delivery Model. Three of its test questions count for choosing organisational building blocks: who decides, who delivers, who uses? Which roles and decision paths does operations need? Which metric shows after 90 days that the solution has landed? The answers produce a selection of blocks that fits the company's problem, whichever model they come from. The scope and terms of an engagement are discussed in the free initial consultation, which you can arrange via [contact](/en/#kontakt).

**Conclusion**
unFIX gives companies building blocks for organisational design and leaves the choice to them. That suits management teams that have a named structural problem, can give up decision rights and steer the rollout themselves or have it accompanied. A test with one block, one metric and a review after 90 days settles whether the model benefits the company.

**Sources**
- Appelo, J.: unFIX, pattern collection for organisational design, unfix.com
- Appelo, J.: Management 3.0, Addison-Wesley, 2011
- Skelton, Pais: Team Topologies, 2019
- Kniberg, Ivarsson: Scaling Agile @ Spotify, white paper, 2012

## Frequently asked questions

### What is the unFIX model?

The unFIX model is a collection of patterns for designing organisations, published by Jurgen Appelo on unfix.com. Companies choose building blocks such as crews, forums, bases and clusters and combine them to suit their situation. It sees itself as a toolkit and does not aim to be a closed framework.

### What is a crew in the unFIX model?

A crew is a team of usually three to seven people who work together on a task. In approach it corresponds to the team in other models, such as the squad in the Spotify model. Several crews work together in a base.

### What is the difference between unFIX and Team Topologies?

Team Topologies describes team types and forms of collaboration along the flow of work, whereas unFIX offers a broader collection of building blocks for structure as well as decisions and growth. The two can be combined, and the author of unFIX has published comparisons. The choice follows the company's problem.

### Is unFIX a successor to the Spotify model?

unFIX is a separate model that takes up and generalises elements such as teams and expert groups. The Spotify model was a snapshot of one company's organisation, while unFIX is a pattern collection. The author compares the two on his website.

### What company size is unFIX suitable for?

The model is intended for different sizes because its building blocks are self-similar: crews form bases, bases form clusters. A department with three teams can work with it just as a corporate division with many can. What matters is that a concrete structural problem exists.

### Are there studies on how well unFIX works?

Independent studies on the model's effectiveness are hard to find. The evidence comes from practitioners and from the author's case descriptions. A company should therefore work with a limited test and its own metric.

### How do you introduce unFIX in a company?

Introduction begins with a named structural problem, picks a building block for it, records decision rights in writing and reviews the effect after 90 days. The model provides no rollout plan of its own. The company needs owners in management and support for the teams affected.

### How much does it cost to introduce unFIX?

The model is freely available on the author's website; the costs arise from the time of those involved and any support. There is no single figure for all companies. The scope and terms of an engagement are discussed in the free initial consultation.
