{
  "abbildung": 1,
  "typ": "saeulen",
  "titel": "Every full month ran more than 35 times above the subscription",
  "beschreibung": "Every full month ran more than 35 times above the subscription. Column chart. 6 values. Highest: September (10,894 USD). Lowest: Subscription per month (200 USD).",
  "sprache": "en",
  "einheit": "USD",
  "schema": false,
  "stichprobe": false,
  "quelle": [
    "Source: Niehues Consulting, own cost measurement, July to November 2026"
  ],
  "daten": [
    {
      "beschriftung": "Subscription per month",
      "wert": 200,
      "anzeige": "200 USD",
      "hervorgehoben": false
    },
    {
      "beschriftung": "July",
      "wert": 4212,
      "anzeige": "4,212 USD",
      "hervorgehoben": false
    },
    {
      "beschriftung": "August",
      "wert": 10127,
      "anzeige": "10,127 USD",
      "hervorgehoben": false
    },
    {
      "beschriftung": "September",
      "wert": 10894,
      "anzeige": "10,894 USD",
      "hervorgehoben": true
    },
    {
      "beschriftung": "October",
      "wert": 7539,
      "anzeige": "7,539 USD",
      "hervorgehoben": false
    },
    {
      "beschriftung": "November (through Nov 16)",
      "wert": 3110,
      "anzeige": "3,110 USD",
      "hervorgehoben": false
    }
  ],
  "beitrag": "https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/",
  "dateien": {
    "svg": "https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/grafik-1.svg",
    "svgStile": {
      "hell": "https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/grafik-1.svg?stil=hell",
      "dunkel": "https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/grafik-1.svg?stil=dunkel",
      "neutral": "https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/grafik-1.svg?stil=neutral"
    },
    "csv": "https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/grafik-1.csv",
    "json": "https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/grafik-1.json"
  },
  "herausgeber": "Niehues Consulting",
  "lizenz": "CC BY 4.0",
  "lizenz_url": "https://creativecommons.org/licenses/by/4.0/deed.en",
  "lizenz_gilt_fuer": "grafik_und_daten",
  "namensnennung": "Niehues Consulting, https://www.niehuesconsulting.de/en/blog/what-agentic-development-costs/",
  "daten_herkunft": "eigen"
}